Skip to content
MWL Group
Whole-home furniture package visual reference from MWL Group

Residential Package Delivery

Whole-home furniture packages built from your floor plan.

A whole-home furniture package turns a single floor plan into one accountable path from furniture and material selection through to delivered interiors, rather than furnishing room by room through separate purchases. MWL builds that package to cover living, dining, bedrooms, storage, loose furniture, custom items, lighting references, appliance coordination, materials and global delivery.

Whole-home package

How a whole-home furniture package stays one accountable path.

A whole-home package turns one floor plan into coordinated furniture, materials and delivery logic across rooms, not disconnected purchases.

What is included in a whole-home furniture package?

Living, dining, bedroom and storage furniture plus materials, lighting references and delivery coordination when named in the written scope. Appliances and site installation are included only when expressly listed.

What do I need to start from a floor plan?

A current plan or measured dimensions, room list, style references, budget band, destination and target move-in or handover date. Screenshots from a layout tool help explain preferred arrangements.

How does Design Credit work on a whole-home package?

100% of approved design fees is credited toward confirmed furniture and material procurement. Eligibility and application are recorded in the written project proposal.

Can existing furniture stay in the package?

Yes. MWL can inventory keep pieces, check dimensions and materials, and specify new items that complete the palette instead of replacing everything by default.

How is a renovation furniture order different from a new-build whole-home package?

A renovation order starts with existing conditions, access limits, retained pieces and replacement requirements. Share the current plan or dimensions, room priorities, photos and destination so the schedule reflects the home as it is. A new-build package is coordinated against the approved room schedule and handover conditions.

Can I keep existing furniture while refreshing a villa or apartment?

Yes. Existing pieces can be inventoried with their dimensions and materials, then new furniture and materials can be specified to complement what stays. MWL can organize those inputs and approval comments in the project record; final design decisions and approvals remain with the parties named in the written scope.

How do I order furniture for multiple rooms together instead of room by room?

Use one room-by-room schedule covering living, dining, bedrooms, storage and other relevant zones, with quantities, dimensions, finishes and retained items. When procurement coordination is included, MWL can consolidate approved items, supplier quotations, sample decisions and order status, including packages assembled from multiple suppliers.

How are phased delivery and on-site receiving handled for a renovation furniture order?

Phases can be organized by room, zone or shipment release, each linked to an item list and receiving contact. The written scope should assign unloading, inspection, storage, damage reporting and onward movement to named parties. Installation is included only when expressly named in that scope.

Project fit

When this service is a fit

  • Furnish a whole home instead of buying room by room
  • Turn a floor plan into an itemized furniture package
  • Coordinate furniture, materials and lighting before renovation or move-in
  • Source a complete furniture and material package from Foshan for an overseas home
  • Work with a supplier who can coordinate international shipping handoffs

Approach

Whole-home furniture package

A whole-home package is different from a room design service. It has to consider circulation, storage, furniture dimensions, finish continuity, lighting, appliance constraints, delivery sequence and site interfaces across the entire residence. MWL starts from the floor plan so the furniture schedule reflects real dimensions, not a loose shopping list.

The service is especially useful for owners furnishing overseas homes, second homes, new apartments or full renovation projects. Instead of separating designer, furniture store, material supplier and shipper, MWL places the main decisions into one technical brief and one order path.

Process

How MWL controls the work

  1. 1

    Submit floor plan, photos, inspiration and destination

  2. 2

    Receive scope review and package direction

  3. 3

    Confirm schedule, materials, budget and design credit terms

  4. 4

    Move into procurement, QC, packing and delivery coordination

Delivery context

What supports the work

A whole-home package works best when rooms, retained items, new furniture, materials, budget and delivery constraints are reviewed together. One coordinated schedule helps the owner see which decisions are fixed, which need samples and which remain provisional.

  • Room list and retained furniture reviewed before the package is priced
  • Furniture, materials and lighting references coordinated by space
  • Samples and custom items identified before order confirmation
  • Packing and delivery planned around the property and access constraints

Pricing inputs

What MWL needs before a reliable proposal

What sets the price
A whole-home package firms up around the floor plan: room count and function, the split between loose furniture and custom pieces, appliance and lighting coordination points, the target move-in date, and how much of the existing home, if any, carries over versus starting fresh.
If the brief is still partial
Clients often start with only a floor plan and a mood board. MWL prices the rooms with enough detail already settled (layout, dimensions) and flags the rooms that need a style-direction conversation before a number can be attached, so the estimate grows with the brief instead of guessing ahead of it.
What to send MWL
Send the floor plan, a room-by-room priority list, any style references, and the target move-in date. MWL will confirm which rooms can be quoted now and which need a short scoping call to settle furniture scale and finish direction first.

FAQ

Procurement FAQ

What's actually included in a whole-home furniture package?expand_more

Loose furniture, custom items, storage, materials, fabrics, lighting references, appliance coordination, schedules, samples, QC and delivery documentation, organized as one package rather than separate room-by-room purchases.

How does the design fee credit work for a whole-home package?expand_more

MWL offers an initial scope review, followed by a paid technical package. 100% of approved design fees is credited toward confirmed furniture and material procurement. Eligibility and application are recorded in the written project proposal.

What are the five stages from floor plan to move-in?expand_more

Scope, specification, procurement, logistics and destination handoff. Timing depends on the written project scope; MWL maps milestones after the floor plan, priorities, approvals and responsibilities are confirmed.

Do I need a finished interior design before starting?expand_more

No. A floor plan, photos, style references and a budget direction are enough to start the scope review. The schedule gets built out from there.

Will a whole-home package work if I want to keep some existing furniture?expand_more

Yes. Existing pieces can be inventoried so new furniture and materials are chosen to complement what stays, rather than replacing everything by default.

Can one supplier coordinate furniture, materials and lighting?expand_more

MWL can coordinate furniture, materials, and lighting under one agreed scope, even when products come from multiple suppliers. It consolidates item schedules, finish references, approval records, and shipment information. Each supplier remains responsible for its own product information and production.

How are samples, QC and packing controlled before shipping?expand_more

MWL tracks sample requests, supplier QC records, and packing documentation before shipment. The scope document identifies who approves samples, who records defects, who confirms packing status, and who gives final acceptance. Physical samples are generally used for upholstery, stone, timber, metal finishes, tile, rugs, glass, and visible lighting components when digital references do not establish the finish.

How are phased delivery and on-site receiving responsibility divided?expand_more

Phased delivery is organized by room, zone, or shipment release, with each phase linked to an item list and receiving contact. The written scope assigns unloading, inspection, storage, damage reporting, and onward movement to named parties. Installation is included only when expressly named in the written scope.

How is a renovation furniture order different from a new-build furniture package?expand_more

Renovation coordination starts with existing conditions, access limits, and replacement requirements. A new-build package is coordinated against the approved room schedule and handover conditions. MWL consolidates supplier information and approvals in both cases, while installation is included only when expressly named in the written scope.

Turn the requirement into a controlled furniture and material package.