What exactly is a furniture schedule?expand_more
A structured list of furniture and related items, organized by room, with quantities, dimensions, finishes, notes and approval status, the control document procurement is placed against, not a mood board.
Is a furniture schedule just another name for a BOQ?expand_more
They overlap but aren't identical. A BOQ emphasizes quantities and budget; MWL's furniture schedule, issued as the F01 Bill of Quantities document within a whole-home package, also carries design, finish and procurement detail a pure BOQ doesn't.
Is a BOQ for furniture called something different in other markets?expand_more
The document is the same; the name follows local practice. UK, Gulf, Indian and wider Commonwealth project teams normally ask for a furniture BOQ, a BOQ for furniture or a bill of quantities. North American teams more often say furniture schedule, FF&E schedule or FF&E specification. MWL issues one document that answers either request, because the fifteen starter fields already carry both readings: room, item code, quantity, unit, unit rate and line total for the quantities view, plus dimensions, material and finish, drawing reference and approval status for the specification view.
Which teams actually reference the schedule during a project?expand_more
Owners, designers, procurement teams, suppliers, contractors, QC teams and logistics coordinators all work from the same schedule, so nobody is quoting or shipping against a different version.
Can MWL build the schedule starting from just a floor plan?expand_more
Yes. MWL can start from drawings, a room list, style references and budget targets, then build a procurement-ready schedule with item codes and quantities from there.
What happens to a schedule that's only in draft form?expand_more
Review the draft for stable item references, quantities and missing specification or approval decisions. Identify what can be priced and what remains an assumption. The schedule supports a quotation review; technical approval and any instruction to order remain separate decisions by the named project authorities.
How far in advance should furniture procurement start, and what are the typical timeline stages?expand_more
Procurement timeline depends on project scope and destination. As general industry guidance, new buildings or major renovations often begin 12-18 months before opening to allow time for supplier evaluation, specification, sample review and approval, quotation development, production, quality inspections, packing, customs processing and delivery coordination; smaller residential or commercial interior projects may need only 6-9 months. The main stages: supplier comparison, specification and sampling, commercial negotiation, order placement, production, pre-shipment inspection, packing and export clearance, and final receiving, each need a sequential decision window with the design team, owner and contractors. The procurement readiness guide sets out the checklist for confirming floor plans, finish decisions, approval owners, delivery destination and timeline before a schedule is released to suppliers, which is what prevents delays and change-order risk downstream.
Can one specification repeat across several unit types?expand_more
Yes, when the specification, finish, quantity basis, and applicability are shared. Reference the common specification and list each unit type or area that uses it. MWL consolidates the cross-references so a change can be checked against every affected location.
How are mirrored plans and finish variants controlled?expand_more
Use distinct unit or room identifiers for handed layouts while retaining a shared base item code where the specification is unchanged. Record handedness, finish, quantity, and exceptions against the relevant identifier. MWL consolidates the variant matrix for review before procurement release. Give each finish variant a stable reference linked to its base furniture item, the changed finish and its intended application. Retain the selected reference and revision without silently replacing the approved specification. Finish coding does not resolve a suite's full furniture configuration, allocate quantities or authorize purchasing; those remain separately reviewed decisions. Update the item finish-reference crosswalk.
How should replacement-stock rules be recorded?expand_more
Record replacement stock as a separate BOQ line or clearly linked allowance, with its specification, intended use, quantity basis, storage or release instruction, and approval owner. Keep it separate from installed quantities so ordering and receiving records remain traceable. MWL consolidates the record with the schedule and supplier quotation. Record replacement stock separately from the furniture required for the current rooms. Link the allowance to the item, unit, intended purpose and project-specific commercial decision. Leave an unconfirmed quantity unknown rather than inserting a standard percentage, and do not treat spare stock as evidence that a particular replacement component is compatible or available. Confirm the stock allowance without changing room demand.
Which fields belong in a furniture BOQ?expand_more
Include item code, description, location, unit type, quantity, dimensions or reference, finish, specification source, approval status, and delivery notes. Add fields for packaging references, replacement stock, substitutions, and variations where relevant. MWL consolidates these fields from approved project information and does not set design requirements by default.
Which approval owners must be named?expand_more
Name the person or team responsible for specification approval, commercial approval, sample or finish approval, and release to procurement. Record approval status, date, and conditions against the affected schedule lines. MWL coordinates the approval record while the named project authorities retain approval responsibility.